APQP Software for Manufacturing Launches
Advanced Product Quality Planning is the layer that decides what a launch owes and when. EasyQualityFlow runs it as a project against a real part and a real customer, connected to the documents it produces.
Already have an account? Login

The plan and the documents usually live apart.
Most APQP tracking is a spreadsheet with a row per deliverable and a column per phase. It works, right up to the point where someone asks whether the control plan in the tracker is the same revision as the control plan in the folder. The tracker knows a date. It does not know the document.
Treating the plan as a project that owns its deliverables closes that gap. An activity is not a row that says "control plan — done"; it is attached to the control plan, at a revision, with the approval that released it.
Projects against a part
A project belongs to a part and a customer, so everything it produces is already scoped to the thing being launched.
Phases and activities
The standard planning phases, with activities underneath them — each with an owner, a due date and a state.
Owners, not teams
An activity is assigned to a person. "Quality" does not answer for a missed date; someone does.
Recorded approvals
Phase and document approvals are recorded against a named person with a timestamp.
Attached documents
The deliverable is linked to the activity, at the revision that satisfied it.
Visible status
What is late, what is next and what is waiting on an approval, without opening the tracker.
APQP is the second stage, and it sets up the rest.
The part comes first, because a plan needs something to plan. Everything after APQP is the plan being executed — risk analysed, controls defined, results recorded, submission assembled.
- Phases with activities, owners and due dates
- Approvals recorded against named people
- Deliverables linked at a specific revision
- The same part record the FMEA and control plan use
- Submission elements traceable back to the activity that produced them
Connected capabilities
Every one of these works on the same record. That is the point of the platform.
Questions about APQP software
What is APQP?
Does EasyQualityFlow follow the standard APQP phases?
Can APQP activities be linked to the documents they produce?
Can we track more than one launch at a time?
Plan your next launch in one place.
Connect APQP to the FMEA, control plan and submission it is supposed to produce.
Questions? support@easyqualityflow.com